The floor tiles
A Close Up of the Tiles 600 X 600 Caesarstone Polished Porcelain from Lexatonia Tiles. The colour I would describe as a white/ grey, the speckle helps hide dirt. The speckle is in the tile not printed on so every tile is different.
Plain old white on the ceilings. All of the cans for the downlights hanging down in the family room.
First coat of waterproofing in the ensuite double shower.
Some of the rooms upstairs have had the skirting and architraves finished.
We started cleaning the render off the windows with acid. Made a huge difference once they were clean. See the the before (left) and after (right) on the sliding door.
Coming up next:
- Waterproofing finished
- Waterproofing inspection
- Wet area tiling
- Finishing of skirting & architraves
- Front door
Other stuff still to be completed:
- External render to be completed
- Garage door to be fitted
- External cross beams to be fitted
- Painting
- rubbish & fill removal + clean up
- Carpet
- Kitchen
- Laundry, Pantry & Wardrobe fitout
- Plumbing final
- Electrical final
- Air con vents & system
- Hot water system
- Driveway
Still a long painful way to go and still no end date in site.
Wow, it's come a long way since your last post. I love your tiles! So shiny :)
ReplyDeleteWith those downlight cans in place, does your insulation still have to have holes in it?
ReplyDeleteB
We dont have insulation between downstairs and upstairs just all the external walls and all around the HT room.
ReplyDeleteIf I did have insulation there they would just keep the insulation bats whole with no holes :) The purpose of the can is to keep the hot bit of the light away from insulation and wiring in the cavity.
I hope that things have been progressing for you guys. Thinking of you and sending good thoughts.